| SERVICE BULLETIN LIST DA62 |
| | | | |
Doc. No. | Description | Rev. | Date | Downl. |
MSB62-002/7 | Software for E4P-C engine, approved versions | 7 | 2022-10-13 |
|
MSB62-003/9
| Exchange of charged air tubing between turbo charger and intercooler Software for Garmin G1000; approved software systems, manifests and configurations | 9 | 2024-04-01 |
|
OSB62-004/2 | Switch between Passenger Seat Row 2 (7-Seat-Configuration) and Rear Baggage Compartment (5-Seat-Configuration) and vice versa | 2 | 2022-12-06 |
|
OSB62-005 | Installation of additional "Lemo" headset jacks | - | 2016-04-04 |
|
OSB62-006 | Retrofit Installation of Sun Visors | - | 2016-06-17 |
|
OSB62-007 | Retrofit Installation of Tablet Mount on A-Column | - | 2017-01-31 |
|
OSB62-008 | Installation of wiring provisions for Heated Static Ports and Aux Fuel Quantity Indication | - | 2016-10-18 |
|
OSB62-009/1 | Approval for Flight Into Known Icing Conditions | 1 | 2016-11-08 |
|
RSB62-010/1 | Replacement of the turbocharger V-clamps | 1 | 2017-11-02 |
|
OSB62-012/1 | Installation of power plant cooling improvement | 1 | 2016-12-12 |
|
RSB62-013 | Improved mounting of 2nd Alternator | - | 2017-03-08 |
|
OSB62-014/1 | Installation of larger fuel cooler and improved NACA duct | 1 | 2018-08-15 |
|
OSB62-015 | Installation of armrest with integrated keypad | - | 2017-05-24 |
|
OSB62-016/1 | Implementation of the increased Maximum Zero Fuel Mass of 2200 kg | - | 2017-06-06 |
|
RSB62-018 | Inspection of rear Rudder Cable Pulley | - | 2017-11-13 |
|
RSB62-019 | Replacement of TKS propeller nozzle | - | 2017-11-13 |
|
MSB62-020 | Inspection of the middle and rear passenger seat lap safety belt connections
| - | 2018-02-09 |
|
MSB62-024/2 | Fuel Tank Interconnect Hose (Flexible Coupling) Replacement | 2 | 2019-08-29 |
|
OSB62-025/1 | Installation Garmin NXI Phase II Equipment | 1 | 2020-06-22 |
|
MSB62-026 | Inspection of Bonding Cables in Engine Installation | - | 2019-09-20 |
|
MSB62-027/1 | Modification to the installation of heated static ports | 1 | 2019-12-05 |
|
MSB62-028/1 | Baggage Net Latches | 1 | 2021-07-06 | |
MSB 62-029 | Drilling of drain holes in the fuselage | - | 2021-02-25 |
|
MSB62-030/1 | Cowling Lightning Protection | 1 | 2020-07-01 |
|
MSB62-031 | Replacement of the autopilot bridle cable clamps | 1 | 2020-02-25 |
|
OSB62-032 | Installation of unfeathering accumulators | - | 2020-01-13 |
|
OSB62-033/1 | Installation of Garmin GTX 345R Transponder (ADS-B) | 1 | 2020-09-03 |
|
OSB62-034 | Installation of Garmin Flight Stream (FS510) | - | 2020-03-20 |
|
MSB62-035 | Bonding cables in engine nacelles | - | 2020-07-27 |
|
MSB62-036/2 | Use of AFM Doc. No. 11.01.05-E | 2 | 2020-08-24 |
|
MSB62-037/2 | Transfer to Type Certificate A00012NY | 2 | 2021-12-23 |
|
MSB62-038 | Inspection of fuel filter installation | - | 2021-09-30 |
|
OSB62-039 | Installation of an updated ELT bracket | - | 2022-11-24 |
|
OSB62-040 | Installation of fuel probes with sealed connectors | - | 2023-03-30 |
|
MSB62-042/1 | Rudder rib correction | 1 | 2023-10-19 |
|
OSB62-043 | Removal of unfeathering accumulators | - | 2023-09-21 |
|
OSB62-044/1 | Replacement of CI 2580-220 antenna with C1 2728-410 antenna | 1 | 2023-09-28 |
|
MSB62-045/2 | Inspection of starter wiring connection | 2 | 2023-09-22 |
|
OSB62-046 | Installation of Amerex 337TS fire extinguisher | - | 2023-08-03 |
|
OSB62-047/1 | Installation of Garmin GWX 75 weather radar | 1 | 2023-10-12 |
|
OSB62-048 | Installation of alternate electric fuel pumps | - | 2023-07-11 |
|
MSB62-049/3 | Installation of hinged drain cover | 3 | 2024-11-21 |
|
RSB62-050 | Installation of Bowden cable extension for parking brake | - | 2023-09-21 |
|
MSB62-051/1 | Replacement of Main Landing Gear and Nose Landing Gear retaining rings | 1 | 2024-03-24 |
|
MSB62-052 | Horizontal stabilizer connecting bolt torque inspection | - | 2023-09-18 |
|
MSB62-055 | Unblocking of drain holes underneath the center wing | - | 2024-06-26 |
|
|