Service Bulletins

 

SERVICE BULLETIN LIST

 

 

 

 

 

 

 

Doc. No. 

Description 

Rev. 

Date 

Downl. 

DAC1-11-01

Chinese Placards (Optional)

3

29/09/2014

DAC1-23-01

GMA 340 Isolation Diodes (Recommended)

-

08/12/2004

DAC1-23-50

Installation of 27 Ohm Resistor (Optional)

-

09/09/2009

DAC1-24-01

Generator Lower Attaching Bolt Replacement (Recommended)

1

03/03/2010

DAC1-24-03

G35M Battery Option (Optional)

2

27/04/2010

DAC1-24-04

Generator Attachment Bracket (Recommended)

3

18/07/2008

DAC1-24-05

Installation of the BC100-1 or the ODS-AGM28LMJ Battery on the Battery Shelf (Optional)

2

30/03/2023

DAC1-24-06

Installation of YTX24HL-BS Battery on Firewall (Optional)

-

14/01/2004

DAC1-24-07

Replacement of Battery/EPU Relay Contactor (Optional)

-

08/11/2012

DAC1-24-08

Installation of the External Power Unit (EPU) System

1

23/01/2020

DAC1-24-09

Installation of the ODS-AGM28LMJ Battery on the Firewall (Optional)

1

18/09/2023

DAC1-25-01

EBC502 to Artex ELT Upgrade (Recommended)

5

16/12/2021

DAC1-25-02

ME406 Installation on Reverse panel (Recommended)

-

23/11/2010

DAC1-25-03

Installation of Safety Hammer, Type II (Optional)

-

19/08/2011

DAC1-25-04

ELT 1000 Retrofit (Optional)

-

28/10/2021

DAC1-27-01

Control Stick Elevator Trim Installation (Optional)

-

26/04/2001

DAC1-27-02

Flap Actuator Bushing Retainers (Optional/Recommended)

1

01/02/2008

DAC1-27-03

Inspection of Flap Bellcrank (Mandatory)

1

13/05/2019

DAC1-27-04

Installation of Diamond Flap Control & Microswitch Tray

1

10/01/2020

DAC1-28-01

Type II Fuel System / Pump Retrofit (Optional)

-

08/10/1998

DAC1-28-02

Two Speed Electric Fuel Pump System (Mandatory)

3

27/10/1999

DAC1-30-02

Installation of a Heated Pitot Static Probe (Optional)

1

25/08/2022

DAC1-31-01

Removal of OAT/Clock AA Battery

-

29/06/2017

DAC1-32-01

Nose Gear Shock Strut (Optional/Recommended)

-

28/02/2007

DAC1-32-02

Optional Installation of Extended Main Landing Gear Struts (Optional)

-

05/06/2009

DAC1-32-03

NLG Wheel and Fork Installation (Recommended)

-

15/07/2011

DAC1-33-01

Recognition Lights (Optional)l

1

21/02/2000

DAC1-33-02

Installation of Replacement Electro Luminescent (EL) Flood Light (Optional)

1

11/08/2011

DAC1-33-04

Installation of Backlighting on the Instrument (Optional)

2

06/02/2012

DAC1-33-05

Installation of RFI protected Lighting Voltage Regulator Assembly

-

23/02/2015

DAC1-33-06

Installation of LED Anti-Collision and Position Light Assembly

3

13/05/2019

DAC1-33-07

Installation of Dimming Module

1

10/01/2020

DAC1-33-08

Installation of LED Landing and Taxi Lights (Optional)

-

2022-10-13

DAC1-34-02

Installation of Backup Artificial Horizon (Optional)

2

28/01/2013

DAC1-34-06

Garmin G500 Software Upgrade

-

07/03/2014

DAC1-34-09

Garmin G500 Software Upgrade 006-B1076-63

-

20/06/2016

DAC1-34-10

GTX345 and TAS605 Audio Lines

-

13/10/2020

DAC1-34-11

Garmin GI 275 Installation

-

13/05/2021

 

DAC1-52-01

Canopy, Seal Replacement (Optional)

-

07/01/1999

DAC1-52-03

Canopy Lock Cover Plate Installation (Recommended)

1

17/08/1999

DAC1-53-01

Spar Bridge Gusset Reinforcement (Recommended)

3

15/09/2014

DAC1-55-01A

Horizontal Stabilizer Attachment (Alert)

3

30/03/2001

DAC1-57-01

Installation of Aileron Roller Guide Access Panels

1

13/05/2019

DAC1-61-00A

Spinner Rear Bulkhead Replacement (Alert)

1

02/04/2001

DAC1-61-01

Sensenich W69EK7-63 Propeller Installation (Recommended)

5

29/11/2019

DAC1-71-01

Cowling Thermal Protection Shielding (Optional)

1

16/05/2002

DAC1-71-02

Engine Mount to Firewall Washers

-

19/01/2004

DAC1-71-03

Winterization Kit (Optional)

-

19/05/2004

DAC1-71-04

Enlarged Cowl Inlet for Hot Weather Ops (Optional)

-

29/06/2004

DAC1-73-04

Engine Fuel System Conversion (Optional/Recommended)

5

26/11/2010

DAC1-73-05

Operating Limitations with Altitude Compensating Fuel Systems

1

14/12/2007

DAC1-74-01

Ignition Harness Routing

1

19/09/2014

DAC1-74-02

Starting Vibrator Battery Installation (Recommended)

-

18/02/2000

DAC1-74-03

Installation of Optional Push-to-Start Ignition Switch (Optional)

2

09/03/2011

DAC1-74-04

Installation of the Yuasa NP1.2-12 starter vibrator battery and battery tray (Optional)

-

01/09/2022

DAC1-76-01

Mixture Cable Kinking (Recommended)

1

29/01/1999

DAC1-76-02

Mixture Cable Routing - Reversed Panel (Recommended)

-

03/12/2003

DAC1-76-03

Installation of Mixture Cable for Altitude Compensating Fuel Pump (Optional)

2

06/03/2006

DAC1-76-04

Throttle Cable Firewall Feed-Thru (Recommended)

1

28/01/2010

DAC1-77-01

Installation of Improved Indicating Systems

5

09/02/2023

DAC1-79-01

Power Plant Cooling (Optional)

-

09/11/1999

DAC1-79-02

Oil Filler Bracket Installation (Recommended)

-

10/04/2001

DAC1-92-03

Mexican Import Requirements

-

28/02/2007

DAC1-92-07

Operation Limit Changes for EASA Member Countries

1

09/08/2012

DAC1-92-08

Installation of Illuminated Placards

-