| SERVICE BULLETIN LIST |
| | | | |
Doc. No. | Description | Rev. | Date | Downl. |
MSB40NG-002/18 | Software for E4-A (AE300) Engine, approved versions | 18 | 2023-09-21 |
|
MSB40NG-003/16 | Software for Garmin G1000; approved software systems, manifests and configurations | 16 | 2024-04-01 |
|
OSB40NG-004 | Installation of a coated safety walk | - | 2010-07-20 |
|
OSB40NG-006 | Import Requirements to CIS | - | 2011-07-11 |
|
OSB40NG-007/1 | Installation of a fuel pressure pulsation damper | 1 | 2014-10-03 |
|
RSB40NG-010 | Installation of check valves on fuel pumps | - | 2011-11-17 |
|
RSB40NG-011 REVOKED
| Exchange of charged air elbow | - | 2012-02-28 |
|
MSB40NG-012/2 | Replacement of aft engine shock mounts | 2 | 2013-03-15 |
|
RSB40NG-013 | Replacement of air conditioning system | - | 2012-07-26 |
|
MSB40NG-015/1 | Installation of a rudder cable guard | 1 | 2013-02-21 |
|
MSB40NG-016/2 | Correction of Airspeed Indicator (ASI) markings | 2 | 2013-06-12 |
|
OSB40NG-017 | CG adjustment | - | 2012-10-09 |
|
MSB40NG-018/1 | Exchange of charged air tubing; incl. WI Rev. 3 | 1 | 2012-11-26 |
|
RSB40NG-019 | Replacement of the Charged Air Hoses with glass fiber reinforced silicone hoses
| - | 2013-06-20 |
|
MSB40NG-020/6 | Inspection of the nose landing gear (NLG) pivot of NLG-legs installed under OÄM 40-334 (landing gear with large tires) for cracks and possible rework or replacement
| 6 | 2016-06-27 |
|
OSB40NG-021 | Installation of alternator regulator, Austro Engine P/N E4A-91-200-000 | - | 2015-02-25 |
|
OSB40NG-022 | Installation of an engine oil quick drain-valve | - | 2014-07-21 |
|
OSB40NG-023 | Installation of a radiator baffle | - | 2013-11-29 |
|
OSB40NG-024 | Installation of Battery Heaters
| - | 2013-12-02 |
|
OSB40NG-025 | Installation of an engine master switch guard | - | 2014-06-24 |
|
OSB40NG-026 | Installation of LED Taxi and Landing Lights
| - | 2014-06-25 |
|
OSB40NG-027 | Installation of LED Position Lights and ACL | - | 2015-11-02 |
|
OSB40NG-028 | Installation of Sun visors
| - | 2014-06-27 |
|
OSB40NG-030 | Installation of Provisions for Operation with Diesel fuel | - | 2014-09-26 |
|
RSB40NG-031 | Installation of permanent maintenance access holes in wings | - | 2014-10-09 |
|
OSB40NG-032/2 | Installation provisions for a safety mesh to protect the fuel vent covers into the wings | 2 | 2019-03-26 |
|
OSB40NG-035 | Installation of a hydraulic NLG damper | - | 2014-12-02 |
|
OSB40NG-036 | Installation of the Coolant Level Sensor D4D-9075-26-26
| - | 2015-02-03 |
|
OSB40NG-037 | Installation of a GPS-Tracker as Carry-On Equipment | - | 2015-04-09 |
|
OSB40NG-038 | Improvement of powerplant cooling | - | 2015-05-26 |
|
OSB40NG-039 | Replacement of nose landing gear strut | - | 2015-05-28 |
|
OSB40NG-040/1 | Installation of the nose landing gear fairings for the lowered nose landing gear (MÄM 40-791/OSB 40NG-039) | 1 | 2015-06-14 |
|
RSB40NG-041/1 | Inspection of NLG elastomer pack center tube | 1 | 2015-12-16 |
|
RSB40NG-042 | Inspection and improved bushing installation of charged air duct assy | - | 2016-03-07 |
|
OSB40NG-044 | Maintenance Access Holes in the Elevator | - | 2016-02-03 |
|
MSB40NG-046/2 | Inspection of turbocharger V-clamp | 2 | 2016-07-22 |
|
OSB40NG-047 | Operation of the air conditioning system during T/O and Landing | - | 2016-07-14 |
|
MSB40NG-048/2 | Inspection of autopilot bridle cable clamps | 2 | 2016-12-01 |
|
OSB40NG-049 | Replacement of main landing gear strut | - | 2016-09-23 |
|
RSB40NG-051 | Installation of a chafe protector on the turbocharger intake hose
| - | 2016-10-24 |
|
RSB40NG-052 | Improved mounting of 2nd Alternator
| - | 2017-03-08 |
|
RSB40NG-053 | Replacement of steel pin of door handle mechanism of canopy and passenger door with an improved design
| - | 2017-06-14 |
|
OSB40NG-055 | Replacement of the charge air hoses and tubes | - | 2017-08-18 |
|
OSB40NG-057 | Activation of Garmin GTX 335R/345R transponders’ ADS-B functions | - | 2019-04-15 |
|
MSB40NG-058/1 | Removal of the Pilot Side Gust Lock Mount | 1 | 2018-11-20 |
|
MSB40NG-059/1 | NLG Tire Pressure Placard | 1 | 2019-05-16 |
|
OSB40NG-060 | Instructions for removal of the RACC system | - | 2019-05-10 |
|
OSB40NG-062 | Installation of the Garmin G1000 NXi Phase II equipment and software | - | 2019-04-22 |
|
MSB40NG-063 | MLG Support Plate | - | 2019-06-18 |
|
MSB40NG-064/2 | Fuel Tank Interconnect Hose (Flexible Coupling) Replacement | 2 | 2019-08-29 |
|
MSB40NG-065/1 | Baggage Net Latches | 1 | 2021-07-06 | |
MSB40NG-066/2 | Cowling Lightning Protection | 2 | 2020-10-09 |
|
MSB40NG-067 | Installation of 7 dB Attenuators | - | 2020-01-24 |
|
MSB40NG-068 | Replacement of NLG tube-type tire with tubeless tire | - | 2020-06-16 |
|
OSB40NG-069 | Installation of Garmin Flight Stream (FS510) | - | 2020-10-20 |
|
MSB40NG-070 | Inspection of safety ropes in the engine installation | - | 2021-02-01 |
|
OSB40NG-071 | Installation of stainless steel underbelly fire protection | - | 2021-08-12 | |
OSB40NG-072 | Installation of alternate coolant tank D44-7521-00-00_3 | - | 2021-04-23 | |
OSB40NG-073 | Installation of redesigned map lights | - | 2021-05-17 |
|
OSB40NG-074 | Installation of a bubble canopy | - | 2021-08-19 |
|
RSB40NG-076 | Upper cowling air duct modification | - | 2022-03-17 |
|
MSB40NG-077 | Inspection of gearbox oil | - | 2022-08-25 |
|
MSB40NG-078/1 | Inspection of rudder cables in the footwells | 1 | 2022-11-24 |
|
RSB40NG-079 | Installation of a stiffener on the alternator cable | - | 2023-03-30 |
|
MSB40NG-080/2 | Inspection of starter wiring connection | 2 | 2023-09-28 |
|
OSB40NG-081 | Installation of Amerex 337TS fire extinguisher | - | 2023-08-03 |
|
OSB40NG-082 | Installation of alternate electric fuel pumps | - | 2023-07-06 |
|
|